Integral Waterproofing Concrete

Project

Singapore – PUB / Upper Pierce Reservoir / Sunway Juarasama Sdn Bhd

Objective

Water retaining structure

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

1999 – 2001

Project Information

Water retaining structure.

Singapore – PUB / Water Tank @ Kent Ridge Water Retaining Structure / Koon Construction

Objective

Water tank – water retaining structure

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2002

Project Information

Water tank @ Kent Ridge

Singapore – Blue Horizon Condominium

Objective

Waterproofing structure

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2004

Project Information

Swimming pool and basement slab

Singapore - Changi Water Reclamation Plant Contract C2A

Objective

Stringent performance specifications, in terms of water absorptions, water penetration, chloride permeability and permeable voids content were imposed on the concrete used for the construction of the CWRP.

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2002 - 2007

Project Information

Watertight shafts to depth of 70 m below ground. Concrete volume estimated 100,000 m3.

Additional Notes :

The concrete specification goes beyond waterproofing.

The development has a 120 year design life and ALL concrete applied in the construction is designed with a focus on durability issues.

WAK / MC’s approach: Extremely Low Permeability and Watertightness against ingress of deleterious-material-bearing water and other transport medium.

Singapore - Changi Water Reclamation Plant Contract C2B

Objective

Stringent performance specifications, in terms of water absorptions, water penetration, chloride permeability and permeable voids content were imposed on the concrete used for the construction of the CWRP.

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2003- - 2007

Project Information

Service Building for Influent Shafts including Control Rooms and Substations. Effluent Junction Chamber and Twin By-Pass Pipeline constructed from waterproofed concrete.

Additional Notes :

The concrete specification goes beyond waterproofing. The development has a 120 year design life and ALL concrete applied in the construction is designed with a focus on durability issues.

WAK / MC’s approach: Extremely Low Permeability and Watertightness against ingress of deleterious-material-bearing water and other transport medium.Slabs and services within shafts / service building. Concrete volume estimated 120,000 m3.

Singapore - Changi Water Reclamation Plant Contract C3B

Objective

Stringent performance specifications, in terms of water absorptions, water penetration, chloride permeability and permeable voids content were imposed on the concrete used for the construction of the CWRP.

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2004 - 2007

Project Information

Liquids Module Facility Structure in cut and fill construction, featuring 3meter thick raft slabs, 400 mm thickness IWP where specified and watertight internal and external walls. Concrete volume estimated 300,000 m3.

Additional Notes :

The concrete specification goes beyond waterproofing. The development has a 120 year design life and ALL concrete applied in the construction is designed with a focus on durability issues.

WAK / MC’s approach: Extremely Low Permeability and Watertightness against ingress of deleterious-material-bearing water and other transport medium.

Singapore - Changi Water Reclamation Plant Contract C4B

Objective

Stringent performance specifications, in terms of water absorptions, water penetration, chloride permeability and permeable voids content were imposed on the concrete used for the construction of the CWRP.

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2004 - 2008

Project Information

Solids Handling Building, featuring 3 m thick raft slabs and building structure, including basement, 400 mm thickness where specified. Concrete volume estimated 40,000 m3.

Additional Notes :

The concrete specification goes beyond waterproofing.

The development has a 120 year design life and ALL concrete applied in the construction is designed with a focus on durability issues.

WAK / MC’s approach: Extremely Low Permeability and Watertightness against ingress of deleterious-material-bearing water and other transport medium

Singapore - Changi Water Reclamation Plant Contract C4C

Objective

Stringent performance specifications, in terms of water absorptions, water penetration, chloride permeability and permeable voids content were imposed on the concrete used for the construction of the CWRP.

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2004 - 2008

Project Information

Construction of Digester Tanks featuring basement slabs, underground construction and tank walls. Top 400 mm of slab treated where specified. Concrete volume estimated 60,000 m3.

Additional Notes :

The concrete specification goes beyond waterproofing.

The development has a 120 year design life and ALL concrete applied in the construction is designed with a focus on durability issues.

WAK / MC’s approach: Extremely Low Permeability and Watertightness against ingress of deleterious-material-bearing water and other transport medium.

Singapore – Singapore Power

Objective

Watertight structure for cable chamber

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2006 -2007

Project Information

Underground cable gallery at Ubi Road 3 / Ubi Ave 3. Tanking system completely constructed with integral waterproofing concrete.

Singapore – MRT Circle Line 823

Objective

Watertight Underground Construction for MRT Station / Civil Defence Bomb Shelters

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2006 - 2007

Project Information

Base slabs – MRT Station for OAR / TK. Top 300 mm of slab treated with MC Special DM.

Singapore – MRT Circle Line 854

Objective

Watertight Underground Construction for MRT Station / Civil Defence Bomb Shelters

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2007 - 2009

Project Information

Base slabs – MRT Station for Botanical Garden & Farrer Stations. Top 300 mm of slab treated.

Singapore – MRT Circle Line 855

Objective

Watertight Underground Construction for MRT Station / Civil Defence Bomb Shelters

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2007 - 2009

Project Information

Base slabs – MRT Station / Cut & Cover for Ayer Rajah / Buona Vista Station / Kent Ridge (NUH) Station and Holland Station. Top 300 mm of slab treated.

Singapore – MRT Circle Line Extension C 1280

Objective

Watertight Base Slabs for station & Sprinkler Tank Rooms, Water Storage Tanks and other water storage facilities.

Product

Muraplast 120S, Muraplast M 88, MC Special DM

Year

2007 - 2008

Project Information

Base slab. MRT Extension Station – for Boon Lay Station / Joo Koon Station

Singapore – Punggol Dam Contract C1

Objective

High durability waterproof concrete for life span of 120 years structure

Product

Muraplast 120S, Muraplast M 88, MC Special DM, Centrilit Fume SX

Year

2007 - 2009

Project Information

Construction of Reservoir Dams, Gates and Ancillary Works at Punggol River.

Additional Notes :

The concrete specification goes beyond waterproofing.

The development has a 120 year design life and ALL concrete applied in the construction is designed with a focus on durability issues.

WAK / MC’s approach: Extremely Low Permeability and Watertightness against ingress of deleterious-material-bearing water and other transport medium.

Enhanced performance with the introduction of highly reactive silica fume suspension to replace densified silica fume previously used at CWRP

Singapore – Serangoon Dam Contract C2

Objective

High durability waterproof concrete for life span of 120 years structure

Product

Muraplast 120S, Muraplast M 88, MC Special DM, Centrilit Fume SX

Year

2007 - 2009

Project Information

Construction of Reservoir Dams, Gates and Ancillary Works at Serangoon River.

Additional Notes :

The concrete specification goes beyond waterproofing.

The development has a 120 year design life and ALL concrete applied in the construction is designed with a focus on durability issues.

WAK / MC’s approach: Extremely Low Permeability and Watertightness against ingress of deleterious-material-bearing water and other transport medium.

Enhanced performance with the introduction of highly reactive silica fume suspension to replace densified silica fume previously used at CWRP

Singapore – Singapore General Hospital

Objective

Construction of Watertight Basement

Product

MC Special DM

Year

2009 - Ongoing

Project Information

Construction of Base Slab and Pile Caps with Integral Waterproof Concrete.